Newsroom  •  Site Map  •  Contact NERC

  
Advanced Search
 
About NERC Standards Compliance Assessments Events Analysis Programs  
 



Published Ballots
TitleBallot Period  
Project 2014-01-DGR-PRC-005-5_Final_Ballot_March_2015 3/2/2015 - 3/11/2015 Details
Project 2014-02 Implementation_Plan_Final_January_2015 1/23/2015 - 2/2/2015 Details
Project 2014-02 CIP-004-7_Final_January_2015 1/23/2015 - 2/2/2015 Details
Project 2014-02 CIP-007-7_Final_January_2015 1/23/2015 - 2/2/2015 Details
Project 2014-02 CIP-011-3_Final_January_2015 1/23/2015 - 2/2/2015 Details
Project 2014-02 CIP-003-7_Final_January_2015 1/23/2015 - 2/2/2015 Details
Project 2014-02 CIP-010-3_Final_January_2015 1/23/2015 - 2/2/2015 Details
Project 2014-02 CIP-003-7_Definition_Final_January_2015 1/23/2015 - 2/2/2015 Details
Project 2014-02 CIP-010-3_Definition_Final_January_2015 1/23/2015 - 2/2/2015 Details
Project 2014-03 TOP-001-3 Final_Ballot_January_2015 1/15/2015 - 1/21/2015 Details
Project 2014-01-DGR-PRC-024-2_Final_Ballot_January_2015 1/13/2015 - 1/22/2015 Details
Project 2014-01-DGR-PRC-019-2_Final_Ballot_January_2015 1/13/2015 - 1/22/2015 Details
Project 2014-01-DGR-PRC-001-1.1(ii)_Final_Ballot_January_2015 1/13/2015 - 1/22/2015 Details
Project 2014-01-DGR-PRC-005-5_Initial_Ballot_December_2014 1/12/2015 - 1/22/2015 Details
Project 2013-03 GMD TPL-007-1_Final_Ballot_December_2014 12/5/2014 - 12/16/2014 Details
Project 2010-13.3 Relay Loadability Stable Power Swings PRC-026-1_Final_Ballot_December_2014 12/5/2014 - 12/16/2014 Details
Project 2014-03 TOP-001-3_Additional_Ballot_December_2014 12/29/2014 - 1/7/2015 Details
Project 2010-14.1 BARC BAL-002-2_Additional_Ballot_March_2015 3/6/2015 - 3/18/2015 Details
Project 2014-02 CIP-010-3_Additional_Ballot_December_2014 12/30/2014 - 1/9/2015 Details
Project 2014-02 CIP-004-7_Additional_Ballot_December_2014 12/30/2014 - 1/9/2015 Details
Project 2014-02 Implementation_Plan_December_2014 12/30/2014 - 1/9/2015 Details
Project 2014-02 CIP-007-7_Additional_Ballot_December_2014 12/30/2014 - 1/9/2015 Details
Project 2014-02 CIP-011-3-Additional_Ballot_December_2014 12/30/2014 - 1/9/2015 Details
Project 2014-02 CIP-010-3_Definition_December_2014 12/30/2014 - 1/9/2015 Details
Project 2014-02 CIP-003-7_Definition_December_2014 12/30/2014 - 1/9/2015 Details
Project 2014-02 CIP-003-7_Additional_Ballot_December_2014 12/30/2014 - 1/9/2015 Details
Project 2014-01-DGR-PRC-024-1X_Initial_Ballot_December_2014 12/10/2014 - 12/23/2014 Details
Project 2014-01-DGR-PRC-019-2_Initial_Ballot_December_2014 12/10/2014 - 12/23/2014 Details
Project 2014-01-DGR-PRC-001-1.1X_Initial_Ballot_December_2014 12/10/2014 - 12/23/2014 Details
Project 2010-13.3 Relay Loadability Stable Power Swings PRC-026-1_Additional_Ballot_November_2014 11/14/2014 - 11/24/2014 Details
Project 2014-02 CIP-004-6_Final_Ballot_October_2014 10/28/2014 - 11/6/2014 Details
Project 2014-02 CIP-007-6_Final_Ballot_October_2014 10/28/2014 - 11/6/2014 Details
Project 2014-02 CIP-011-2_Final_Ballot_October_2014 10/28/2014 - 11/6/2014 Details
Project 2014-02 CIP-003-6_Final_Ballot_October_2014 10/28/2014 - 11/6/2014 Details
Project 2014-02 CIP-010-2_Final_Ballot_October_2014 10/28/2014 - 11/6/2014 Details
Project 2014-02 CIP-006-6_Final_Ballot_October_2014 10/28/2014 - 11/6/2014 Details
Project 2014-02 CIP-009-6_Final_Ballot_October_2014 10/28/2014 - 11/6/2014 Details
Project 2014-02 Implementation_Plan_Final_Ballot_October_2014 10/28/2014 - 11/6/2014 Details
Project 2014-01 VAR-002-4_Final_Ballot_October_2014 10/28/2014 - 11/6/2014 Details
Definition_of_Remedial_Action_Scheme_Final_Ballot_October_2014 10/28/2014 - 11/6/2014 Details
Project 2014-01-DGR-PRC-004-2.1(i)a_Final_Ballot 10/28/2014 - 11/6/2014 Details
Project 2014-01_ PRC-004-4_Final_Ballot_October_2014 10/28/2014 - 11/6/2014 Details
Project 2007-11 DM PRC-002-2_Final_Ballot 10/28/2014 - 11/6/2014 Details
Project 2009-03 Emergency Operations EOP-011-1_Final_Ballot_October_2014 10/28/2014 - 11/6/2014 Details
Project 2013-03 GMD TPL-007-1_Additional_Ballot_November_2014 11/12/2014 - 11/21/2014 Details
Project 2008-02 UFLS PRC-006-2_Final 10/22/2014 - 10/31/2014 Details
Project 2007-17.3 PSMT - Sudden Pressure Relays PRC-005-4_final 10/20/2014 - 10/29/2014 Details
Project 2014-03 IRO-017-1_final_Ballot 10/10/2014 - 10/20/2014 Details
Project 2014-03 IRO-014-3_Final_Ballot 10/10/2014 - 10/20/2014 Details
Project 2014-03 IRO-008-2_Final_Ballot 10/10/2014 - 10/20/2014 Details
Project 2014-03 TOP/IRO Implementation Plan_Final_Ballot 10/10/2014 - 10/20/2014 Details
Project 2014-03 Definitions_Final_Ballot 10/10/2014 - 10/20/2014 Details
Project 2014-03 IRO-010-2_Final_Ballot 10/10/2014 - 10/20/2014 Details
Project 2014-03 IRO-002-4_Final_Ballot 10/10/2014 - 10/20/2014 Details
Project 2014-03 IRO-001-4_Final_Ballot 10/10/2014 - 10/20/2014 Details
Project 2014-03 TOP-001-3_Additional_Ballot_November_2014 11/4/2014 - 11/10/2014 Details
Project 2014-03 TOP-002-4_Final_Ballot 10/10/2014 - 10/20/2014 Details
Project 2014-03 TOP-003-3_Final_Ballot 10/10/2014 - 10/20/2014 Details
Project 2014-02 CIP Implementation Plan 10/8/2014 - 10/17/2014 Details
Project 2014-02 Definition CIP-010-2 10/8/2014 - 10/17/2014 Details
Project 2014-01_ PRC-004-4 Additional Ballot Oct 2014 10/10/2014 - 10/22/2014 Details
Project 2014-01-DGR-PRC-004-2.1a_X Additional Ballot Oct 2014 10/10/2014 - 10/22/2014 Details
Project 2007-11 DM PRC-002-2 Additional Ballot 10/10/2014 - 10/22/2014 Details
Project 2009-03 Emergency Operations EOP-011-1_Additional Ballot 10/10/2014 - 10/20/2014 Details
Project 2008-02 UVLS PRC-010-1 Final Ballot 2014 9/9/2014 - 9/18/2014 Details
Project 2014-02 Definition CIP-003-6 10/8/2014 - 10/17/2014 Details
Definition_of_Remedial_Action_Scheme_Additional_Ballot 10/3/2014 - 10/14/2014 Details
Project 2014-02 CIP Version X 10/8/2014 - 10/17/2014 Details
Project 2014-02 CIP-010-2 10/8/2014 - 10/17/2014 Details
Project 2014-02 CIP-003-6 10/8/2014 - 10/17/2014 Details
Project 2014-01 VAR-002-2b(X)_Additional_Ballot 10/7/2014 - 10/16/2014 Details
Project 2013-03 GMD TPL-007-1_Additional_Ballot 10/1/2014 - 10/10/2014 Details
Project 2010-13.3 Relay Loadability Stable Power Swings PRC-026-1_additional_ballot 9/26/2014 - 10/6/2014 Details
Project 2014-01 VAR-002-4_additional_ballot 10/7/2014 - 10/16/2014 Details
Project 2014-01 PRC-005-3(X)_final_ballot 8/27/2014 - 9/5/2014 Details
Project 2014-01 PRC-005-2(X)_final_ballot 8/27/2014 - 9/5/2014 Details
Project 2008-02 UFLS PRC-006-2_in 9/29/2014 - 10/8/2014 Details
Project 2010-14.1 BARC BAL-002-2 Additional Ballot 2014 sc_3 9/23/2014 - 10/3/2014 Details
Project 2014-03 IRO-001-4 June 2014_sc_1 9/10/2014 - 9/19/2014 Details
Project 2014-03 IRO-002-4 June 2014_sc_1 9/10/2014 - 9/19/2014 Details
Project 2014-03 IRO-008-2 June 2014_sc_1 9/10/2014 - 9/19/2014 Details
Project 2014-03 IRO-010-2 June 2014_sc_1 9/10/2014 - 9/19/2014 Details
Project 2014-03 IRO-014-3 June 2014_sc_1 9/10/2014 - 9/19/2014 Details
Project 2014-03 IRO-017-1 June 2014_sc_1 9/10/2014 - 9/19/2014 Details
Project 2014-03 TOP-001-3 June 2014_sc_1 9/10/2014 - 9/19/2014 Details
Project 2014-03 TOP-002-4 June 2014_sc_1 9/10/2014 - 9/19/2014 Details
Project 2014-03 TOP/IRO Implementation Plan June 2014_sc_1 9/10/2014 - 9/19/2014 Details
Project 2014-03 Definitions June 2014_sc_1 9/10/2014 - 9/19/2014 Details
Project 2014-03 TOP-003-3 June 2014_sc_1 9/10/2014 - 9/19/2014 Details
Project 2007-17.3 PSMT - Sudden Pressure Relays PRC-005-X_sc_1 9/3/2014 - 9/12/2014 Details
Project 2010-05.1 Protection Systems: Misoperations Jan 2013_fl 7/29/2014 - 8/7/2014 Details
Project 2014-01_ PRC-004-3_X 8/15/2014 - 8/26/2014 Details
Project 2014-02 Definition July 2014_in 7/7/2014 - 7/16/2014 Details
Project 2014-02 CIP-011-2 July 2014_in 7/7/2014 - 7/16/2014 Details
Project 2014-02 CIP-010-2 July 2014_in 7/7/2014 - 7/16/2014 Details
Project 2014-02 CIP-009-6 July 2014_in 7/7/2014 - 7/16/2014 Details
Project 2014-02 CIP-007-6 July 2014_in 7/7/2014 - 7/16/2014 Details
Project 2014-02 CIP-006-6 July 2014_in 7/7/2014 - 7/16/2014 Details
Project 2014-02 CIP-004-6 July 2014_in 7/7/2014 - 7/16/2014 Details
Project 2014-02 CIP-003-6 July 2014_in 7/7/2014 - 7/16/2014 Details
Project 2014-01-DGR-PRC-004-2.1a_X 8/15/2014 - 8/26/2014 Details
Project 2009-03 Emergency Operations EOP-011-1_Standard_in 8/6/2014 - 8/15/2014 Details
Project 2008-02 UVLS PRC-010-1 2014_in 7/29/2014 - 8/8/2014 Details
Project 2012-13 Nuclear Plant Interface Coordination NUC-001-3_fl 6/23/2014 - 7/3/2014 Details
Project 2014-03 Definitions June 2014_in 6/23/2014 - 7/2/2014 Details
Project 2014-03 TOP/IRO Implementation Plan June 2014_in 6/23/2014 - 7/2/2014 Details
Project 2014-03 TOP-003-2 June 2014_in 6/23/2014 - 7/2/2014 Details
Project 2014-03 TOP-002-4 June 2014_in 6/23/2014 - 7/2/2014 Details
Project 2014-03 TOP-001-3 June 2014_in 6/23/2014 - 7/2/2014 Details
Project 2014-03 IRO-017-1 June 2014_in 6/23/2014 - 7/2/2014 Details
Project 2014-03 IRO-014-3 June 2014_in 6/23/2014 - 7/2/2014 Details
Project 2014-03 IRO-010-2 June 2014_in 6/23/2014 - 7/2/2014 Details
Project 2014-03 IRO-008-2 June 2014_in 6/23/2014 - 7/2/2014 Details
Project 2014-03 IRO-002-4 June 2014_in 6/23/2014 - 7/2/2014 Details
Project 2014-03 IRO-001-4 June 2014_in 6/23/2014 - 7/2/2014 Details
Project 2013-03 GMD TPL-007-1_in 7/21/2014 - 7/30/2014 Details
Project 2014-01 VAR-002-4_in 7/18/2014 - 7/29/2014 Details
Project 2014-01 VAR-002-2b(X)_in 7/18/2014 - 7/29/2014 Details
Project 2014-01 PRC-005-X(X)_in 7/18/2014 - 7/29/2014 Details
Project 2014-01 PRC-005-3(X)_in 7/18/2014 - 7/29/2014 Details
Project 2014-01 PRC-005-2(X)_in 7/18/2014 - 7/29/2014 Details
Definition_of_Remedial_Action_Scheme_062014_in 7/16/2014 - 7/25/2014 Details
Project 2010-05.1 Protection Systems: Misoperations Successive Jan 2013_sc_2 6/20/2014 - 7/9/2014 Details
2014-04_CIP-014-1_Final_Ballot_May_2014 5/1/2014 - 5/5/2014 Details
Project 2007-11 DM Additional Ballot_sc_1 6/13/2014 - 6/25/2014 Details
Project 2013-04 Voltage and Reactive Control VAR-002-3 Final_Ballot_April_2014 4/23/2014 - 5/5/2014 Details
Project 2010-04 MOD-031-1 (MOD C) Ballot 1_fl 4/25/2014 - 5/5/2014 Details
Project 2010-13.3 Relay Loadability Stable Power Swings PRC-026-1_Initial_Ballot 5/30/2014 - 6/9/2014 Details
Project 2007-17.3 PSMT - Sudden Pressure Relays PRC-005-X_in 5/23/2014 - 6/3/2014 Details
Project 2012-13 Nuclear Plant Interface Coordination NUC-001-3_in 5/13/2014 - 5/22/2014 Details
Project 2010-02 Facility Interconnection Studies FAC-002-1_in 5/6/2014 - 5/16/2014 Details
Project 2010-02 Facilities Interconnection FAC-001-1_in 5/6/2014 - 5/16/2014 Details
Project 2007-02 COM-002-4 Final Ballot March_2014_fl 3/28/2014 - 4/7/2014 Details
2014-04_CIP-014-1_Ballot_1_in 4/20/2014 - 4/24/2014 Details
Project 2013-04 Voltage and Reactive Control VAR-002-3 Ad_Ballot_April_2014 4/4/2014 - 4/16/2014 Details
Project 2010-04 MOD-031-1 (MOD C) Additional_Ballot _ab_April_2014 4/1/2014 - 4/14/2014 Details
Project 2008-12 Def and IP Final Ballot_1 _fb 1/31/2014 - 2/10/2014 Details
Project 2010-03 MOD-033-1 (MOD B) Final Ballot 1_fl 1/27/2014 - 2/5/2014 Details
Project 2010-01 Training PER-005-2_final_ballot 1/27/2014 - 2/5/2014 Details
Project 2008-12 INT-004-3_final_ballot 1/27/2014 - 2/5/2014 Details
Project 2008-12 INT-010-2_final_ballot 1/27/2014 - 2/5/2014 Details
Project 2008-12 Def and IP Ballot_1 _sc_1 1/16/2014 - 1/29/2014 Details
Project 2010-05.1 Protection Systems: Misoperations Additional Ballot March_2014_ab_1 2/21/2014 - 3/11/2014 Details
Project 2007-02 COM-002-4_additional_ballot 1/22/2014 - 2/4/2014 Details
Project 2013-04 Voltage and Reactive Control VAR-001-4 final_ballot 1_fb 12/13/2013 - 12/23/2013 Details
Project 2012-05 ATC Revisions MOD A (MOD-001-2) Final_Ballot 1_fb 12/11/2013 - 12/20/2013 Details
Project 2008-12 Def and IP Final_Ballot_1 _fb 12/10/2013 - 12/20/2013 Details
Project 2008-12 INT-004-3 Additional_Ballot_1_ab_1 1/10/2014 - 1/22/2014 Details
Project 2008-12 INT-010-2_1_Additional_Ballot_ab_1 1/10/2014 - 1/22/2014 Details
Project 2008-12 INT-011-1 Final Ballot_1_fb 12/10/2013 - 12/20/2013 Details
Project 2008-12 INT-009-2 Final Ballot_1_fb 12/10/2013 - 12/20/2013 Details
Project 2008-12 INT-006-4 Final Ballot_1_fb 12/10/2013 - 12/20/2013 Details
Project 2010-03 MOD-033-1 (MOD B) Additional Ballot 1_ab_3 1/10/2014 - 1/22/2014 Details
Project 2010-01 Training PER-005-2 January 2014 Additional Ballot_ab_3 1/8/2014 - 1/21/2014 Details
Project 2007-06 Successive Ballot PRC-027-1 December 2012_ad_2 12/9/2013 - 12/31/2013 Details
Project 2010-17 Definition of BES - Phase 2 Final Ballot November_2013_fl 11/8/2013 - 11/18/2013 Details
Project 2007-11 DM Ballot_in 12/6/2013 - 12/16/2013 Details
Project 2010-14.1 BARC BAL-002-2 Additional Ballot Dec 2013_ad_2 12/2/2013 - 12/11/2013 Details
Project 2013-03 GMD Final Ballot October 2013_fl 10/25/2013 - 11/4/2013 Details
Project 2013-04 Voltage and Reactive Control VAR-002-3 ballot_sc_Nov_2013 11/15/2013 - 11/26/2013 Details
Project 2007-02 COM-002-4 Successive Ballot October_2013_sc_2 10/25/2013 - 11/7/2013 Details
Project 2007-17.2 Ballot_October_2013_fl 10/16/2013 - 10/25/2013 Details
Project 2013-04 Voltage and Reactive Control VAR-001-4 ballot_sc_Nov_2013 11/15/2013 - 11/26/2013 Details
Project 2010-03 MOD-033-1 (MOD B) Ballot_sc_Nov_2013 11/8/2013 - 11/20/2013 Details
Project 2010-04 MOD-031-1 (MOD C) Ballot 2__Nov_2013_sc_1 11/13/2013 - 11/22/2013 Details
Project 2010-03 MOD-032-1 (MOD B) Ballot_sc_Nov_2013 11/8/2013 - 11/20/2013 Details
Project 2008-12 Def and IP Ballot_1 _in 11/4/2013 - 11/15/2013 Details
Project 2008-12 INT-011-1 Ballot_1 _in 11/4/2013 - 11/13/2013 Details
Project 2008-12 INT-009-2 Ballot_1 _in 11/4/2013 - 11/13/2013 Details
Project 2008-12 INT-010-2_1_in 11/4/2013 - 11/13/2013 Details
Project 2008-12 INT-006-4 Ballot_1_in 11/4/2013 - 11/13/2013 Details
Project 2008-12 INT-004-3 Ballot_1_in 11/4/2013 - 11/13/2013 Details
Project 2010-17 Definition of BES - Phase 2 Oct 2013_sc_3 10/18/2013 - 10/29/2013 Details
Project 2010-01 Training PER-005-2 Oct 2013 Additional Ballot_ad_2 11/1/2013 - 11/12/2013 Details
Project 2012-INT-06 CIP-003-3 Initial Ballot Sept 2013_fl 9/11/2013 - 9/20/2013 Details
Project 2012-INT-04 Interpretation of CIP-007-3 for ITC Sept 2013_fl 9/11/2013 - 9/20/2013 Details
Project 2010-13.2 PRC-023 Ballot_1 July 2013_fl 9/4/2013 - 9/13/2013 Details
Project 2013-03 GMD Additional Ballot October 2013_sc_1 10/9/2013 - 10/21/2013 Details
Project 2012-05 ATC Revisions MOD A (MOD-001-2) Ballot_ad 11/8/2013 - 11/20/2013 Details
Project 2010-17 Definition of BES - Phase 2 August 2013_sc_1 8/26/2013 - 9/4/2013 Details
Project 2010-14.1 BARC BAL-002-2 Ballot_2 Sept 2013_sc_1 9/6/2013 - 9/17/2013 Details
Project 2010-13.2 Relay Loadability PRC-025-1 Final Ballot Jan 2013_rc 8/2/2013 - 8/12/2013 Details
Project 2010-03 MOD-032-1 and MOD-033-1 (MOD B) Ballot 1_in 8/26/2013 - 9/4/2013 Details
Project 2010-04 MOD-031-1 (MOD C) Ballot 1_in 8/26/2013 - 9/4/2013 Details
Project 2013-04 Voltage and Reactive Control VAR-001-4 and VAR-002-3 ballot 1_in 8/23/2013 - 9/4/2013 Details
Project 2010-01 Training PER-005-2 August 2013 Initial Ballot_in 8/23/2013 - 9/3/2013 Details
Project 2010-14.1 BARC BAL-001-2 Final Ballot 7/16/2013 - 7/25/2013 Details
Project 2012-05 ATC Revisions MOD A (MOD-001-2) Ballot 1_in 8/16/2013 - 8/27/2013 Details
Project 2013-03 GMD Initial Ballot August 2013_in 8/2/2013 - 8/13/2013 Details
Project 2010-13.2 PRC-023 Ballot_1 July 2013_in 7/26/2013 - 8/8/2013 Details
Project 2010-13.2 Relay Loadability PRC-025-1 Ballot July 2013_sc_2 7/10/2013 - 7/19/2013 Details
Project 2007-02 COM-003-1 Successive Ballot 2013_sc_1 7/10/2013 - 7/19/2013 Details
Project 2007-17.2 PRC-005-3 August 2013 Ballot_1_in 8/14/2013 - 8/26/2013 Details
Project 2007-06 Successive Ballot PRC-027-1 November 2012_sc_1 6/24/2013 - 7/3/2013 Details
Project 2010-17 Definition of BES - Phase 2 July 2013_in 7/3/2013 - 7/12/2013 Details
Project 2010-13.2 Relay Loadability PRC-025-1 Successive Ballot Apr 2013_sc_1 5/15/2013 - 5/24/2013 Details
Project 2012-08.1 Phase 1 Glossary Updates February 2013_rc 4/18/2013 - 4/29/2013 Details
Project 2007-09 PRC-024-1 Recirculation Ballot March 2013_in 3/18/2013 - 3/27/2013 Details
Project 2007-02 COM-003-1 Successive Ballot March 2013_in 3/25/2013 - 4/8/2013 Details
Project 2012-08.1 Phase 1 Glossary Updates February 2013_in 3/13/2013 - 3/22/2013 Details
Project 2012-INT-06 CIP-003-3 Initial Ballot Feb 2013_in 3/13/2013 - 3/22/2013 Details
Project 2012-INT-04 Interpretation of CIP-007-3 for ITC Feb 2013_in 3/13/2013 - 3/22/2013 Details
Project 2007-09 PRC-024-1 Successive Ballot Jan 2013_in 2/15/2013 - 2/28/2013 Details
Project 2010-05.1 Protection Systems: Misoperations Successive Jan 2013_in 2/11/2013 - 2/20/2013 Details
Project 2010-11 Recirculation Ballot Jan 2013_in 1/22/2013 - 1/31/2013 Details
Project 2012-INT-05 Recirculation Ballot CIP-002-3 for OGE Jan 2013_in 1/14/2013 - 1/23/2013 Details
Project 2012-INT-02 Recirculation Ballot TPL-003-0a and TOP-004-0 Jan 2013_in 1/23/2013 - 1/31/2013 Details
Project 2010-14.1 BARC BAL-013-1 Initial Ballot Mar 2013_in 4/16/2013 - 4/25/2013 Details
Project 2010-14.1 BARC BAL-002-2 Initial Ballot Mar 2013_in 4/16/2013 - 4/25/2013 Details
Project 2010-14.1 BARC BAL-001-2 Initial Ballot Mar 2013_in 4/16/2013 - 4/25/2013 Details
Project 2010-13.2 Relay Loadability PRC-025-1 Initial Ballot Jan 2013_in 3/1/2013 - 3/11/2013 Details
Standard Processes Manual_SPIG Recommendations Recirculation Ballot Jan 2013_in 1/18/2013 - 1/28/2013 Details
Project 2013-02 Recirculation Ballot January 2013_in 1/8/2013 - 1/17/2013 Details
Project 2007-09 Recirculation Ballot PRC-019 December 2012_in 12/12/2012 - 12/21/2012 Details
Project 2007-09 Recirculation Ballot MOD-027_in 12/12/2012 - 12/21/2012 Details
Project 2007-09 Recirculation Ballot MOD-026_in 12/12/2012 - 12/21/2012 Details
Project 2007-09 Recirculation Ballot MOD-025_in 12/12/2012 - 12/21/2012 Details
Project 2010-11 Successive Ballot December 2012_in 1/2/2013 - 1/11/2013 Details
Project 2007-09 Successive Ballot PRC-024-1 December 2012_in 1/2/2013 - 1/11/2013 Details
Project 2007-12 Frequency Response Recirculation Ballot December 2012_in 12/12/2012 - 12/21/2012 Details
SPM Revisions Successive Ballot December 2012_in 12/11/2012 - 12/20/2012 Details
Project 2007-06 Successive Ballot PRC-027-1 November 2012_in 12/7/2012 - 12/17/2012 Details
Project 2007-02 Successive Ballot COM-003-1 November 2012_in 12/4/2012 - 12/13/2012 Details
Project 2010-14.1 Initial Ballot BAL-012 December 2012_in 1/4/2013 - 1/14/2013 Details
Project 2012-INT-05 Interpretation of CIP-002-3 for OGE_in 12/11/2012 - 12/20/2012 Details
Project 2009-01 DSR Recirculation Ballot October 2012_in 10/24/2012 - 11/5/2012 Details
Project 2008-06 Recirculation Ballot Implementation Plan October 2012_in 10/26/2012 - 11/5/2012 Details
Project 2008-06 Recirculation Ballot Definitions October 2012_in 10/26/2012 - 11/5/2012 Details
Project 2008-06 Recirculation Ballot CIP-011-1 October 2012_in 10/26/2012 - 11/5/2012 Details
Project 2008-06 Recirculation Ballot CIP-010-1 October 2012_in 10/26/2012 - 11/5/2012 Details
Project 2008-06 Recirculation Ballot CIP-009-5 October 2012_in 10/26/2012 - 11/5/2012 Details
Project 2008-06 Recirculation Ballot CIP-008-5 October 2012_in 10/26/2012 - 11/5/2012 Details
Project 2008-06 Recirculation Ballot CIP-007-5 October 2012_in 10/26/2012 - 11/5/2012 Details
Project 2008-06 Recirculation Ballot CIP-006-5 October 2012_in 10/26/2012 - 11/5/2012 Details
Project 2008-06 Recirculation Ballot CIP-004-5 October 2012_rev1_in 10/26/2012 - 11/5/2012 Details
Project 2008-06 Recirculation Ballot CIP-005-5 October 2012_in 10/26/2012 - 11/5/2012 Details
Project 2008-06 Recirculation Ballot CIP-003-5 October 2012_in 10/26/2012 - 11/5/2012 Details
Project 2008-06 Recirculation Ballot CIP-002-5 October 2012_in 10/26/2012 - 11/5/2012 Details
Project 2012-INT-02 Initial Ballot TPL-003 and TPL-004 Interpret Nov 2012_in 11/26/2012 - 12/6/2012 Details
Project 2007-09 Successive Ballot PRC-019-1 Oct 2012_in 10/19/2012 - 10/31/2012 Details
Project 2007-09 Successive Ballot MOD-027-1 Oct 2012_in 10/19/2012 - 10/31/2012 Details
Project 2007-09 Successive Ballot MOD-025-2 Oct 2012_in 10/19/2012 - 10/31/2012 Details
Project 2007-09 Successive Ballot PRC-024-1 Oct 2012_in 10/19/2012 - 10/31/2012 Details
Project 2007-09 Successive Ballot MOD-026-1 October 2012_in 10/19/2012 - 11/2/2012 Details
Project 2007-17 Recirculation Ballot PRC-005-2 October 2012_in 10/15/2012 - 10/24/2012 Details
Project 2007-12 Successive Ballot Frequency Response Oct 2012_in 10/26/2012 - 11/6/2012 Details
Project 2012-INT-02 Interpretation of TPL-003 and TPL-004 for SPCS Oct 2012_in 9/1/2000 - 9/1/2000 Details
Project 2013-02 Paragraph 81 Initial Ballot October 2012_in 11/30/2012 - 12/10/2012 Details
Project 2010-11 TPL footnote b Initial Ballot October 2012_in 11/9/2012 - 11/19/2012 Details
Project 2009-19 BAL-002 Recirculation Ballot Sept 2012_in 9/28/2012 - 10/8/2012 Details
Project 2008-06 Successive Ballot Implementation Plan CIPV5 Sept 2012_in 10/1/2012 - 10/10/2012 Details
Project 2008-06 Successive Ballot Definitions CIPV5 September 2012_in 10/1/2012 - 10/10/2012 Details
Project 2008-06 Successive Ballot CIP-011-1 September 2012_in 10/1/2012 - 10/10/2012 Details
Project 2008-06 Successive Ballot CIP-010-1 September 2012_in 10/1/2012 - 10/10/2012 Details
Projectd 2008-06 Successive Ballot CIP-009-5 September 2012_in 10/1/2012 - 10/10/2012 Details
Project 2008-06 Successive Ballot CIP-008-5 September 2012_in 10/1/2012 - 10/10/2012 Details
Project 2008-06 Successive Ballot CIP-007-5 September 2012_in 10/1/2012 - 10/10/2012 Details
Project 2010-INT-01 Recirculation Ballot TOP-006-3 September 2012_in 9/12/2012 - 9/21/2012 Details
Project 2008-06 Successive Ballot CIP-006-5 September 2012_in 10/1/2012 - 10/10/2012 Details
Project 2008-06 Successive Ballot CIP-005-5 September 2012_in 10/1/2012 - 10/10/2012 Details
Project 2008-06 Successive Ballot CIP-004-5 September 2012_in 10/1/2012 - 10/10/2012 Details
Project 2008-06 Successive Ballot CIP-003-5 September 2012_in 10/1/2012 - 10/10/2012 Details
Project 2008-06 Successive Ballot CIP-002-5 September 2012_in 10/1/2012 - 10/10/2012 Details
Revisions to Outstanding VRFs and VSLs_in 10/10/2012 - 10/23/2012 Details
Project 2009-01 Successive Ballot DSR August 2012_in 9/18/2012 - 9/27/2012 Details
Revisions to the NERC SPM to Implement SPIG Recommendations Aug 2012_in 10/3/2012 - 10/12/2012 Details
Project 2007-02 COM-003 Successive Ballot September 2012_in 9/11/2012 - 9/20/2012 Details
Project 2006-06 COM-001 Recirculation Ballot August 2012_in 9/6/2012 - 9/17/2012 Details
Project 2007-17 Successive Ballot PSMT July 2012_in 8/17/2012 - 8/27/2012 Details
Project 2010-05.1 PRC-004-3 Initial Ballot July 2012_in 8/29/2012 - 9/7/2012 Details
Project 2009-19 Successive Ballot BAL-002 July 2012_in 8/23/2012 - 9/4/2012 Details
Project 2011-INT-02 Rapid Revision of VAR-002 Constellation Interpretation_in 7/18/2012 - 7/28/2012 Details
Project 2012-08.1 Phase 1 of Glossary Updates: Statutory Definitions_in 7/24/2012 - 8/2/2012 Details
Project 2010-INT-01 TOP-006-2 for FMPP June 2012_in 7/20/2012 - 7/30/2012 Details
Project 2006-06 Successive Ballot COM-001-2 June 2012_in 6/27/2012 - 7/9/2012 Details
Project 2006-06 Recirculation Ballot July 2012 IRO-001-3_in 6/27/2012 - 7/6/2012 Details
Project 2006-06 Recirculation Ballot July 2012 COM-002-3_in 6/27/2012 - 7/6/2012 Details
Project 2007-17 Successive Ballot PSMT June 2012_in 6/18/2012 - 6/27/2012 Details
Project 2011-INT-02 VAR-002 Successive Ballot June 2012_in 6/18/2012 - 6/27/2012 Details
Project 2007-06 Initial Ballot PRC-027-1 June 2012_in 6/26/2012 - 7/5/2012 Details
Project 2007-02 COM-003-1 May 2012 Initial Ballot_in 6/11/2012 - 6/20/2012 Details
Project 2009-01 Disturbance and Sabotage Reporting EOP-004-2 _in 5/15/2012 - 5/24/2012 Details
Project 2010-07 PRC-005-1.1a initiai Ballot_rc 4/24/2012 - 5/3/2012 Details
Projectd 2007-03 Recirculation TOP-003-2 April 2012_in 4/27/2012 - 5/6/2012 Details
Project 2007-03 Recirculation Ballot TOP-002-3 April 2012_in 4/27/2012 - 5/6/2012 Details
Project 2007-03 Recirculation Ballot TOP-001-2 April 2012_in 4/27/2012 - 5/6/2012 Details
Project 2010-07 Recirculation Ballot FAC-003-3 April 2012_in 4/24/2012 - 5/3/2012 Details
Project 2010-07 Recirculation Ballot FAC-003-x April 2012_in 4/24/2012 - 5/3/2012 Details
Project 2010-INT-05 CIP-002-1 R3 for Duke Energy_rc 4/20/2012 - 4/30/2012 Details
Project 2009-26 Recirculation Ballot April 2012 CIP-004-x_in 4/20/2012 - 4/30/2012 Details
Project 2007-03 Successive Ballot TOP-002-3 March 2012_in 4/11/2012 - 4/20/2012 Details
Project 2007-03 SB TOP-001-2 March 2012_in 4/11/2012 - 4/20/2012 Details
Project 2007-03 SB TOP-003-2 March 2012_in 4/11/2012 - 4/20/2012 Details
Project 2010-07 FAC-003-3 Successive Ballot March 2012_in 3/30/2012 - 4/9/2012 Details
Project 2010-07 FAC-003-x Successive Ballot March 2012_in 3/30/2012 - 4/9/2012 Details
Project 2008-06 CIP Implementation Plan SB May 2012_in 5/11/2012 - 5/21/2012 Details
Project 2008-06 CIP Definition SB May 2012 _in 5/11/2012 - 5/21/2012 Details
Project 2008-06 CIP-011-1 CSO706 V5 SB 2012_in 5/11/2012 - 5/21/2012 Details
Project 2008-06 CIP-010-5 CSO706 V5 SB 2012_in 5/11/2012 - 5/21/2012 Details
Project 2008-06 CIP-009-5 CSO706 V5 SB 2012_in 5/11/2012 - 5/21/2012 Details
Project 2008-06 CIP-008-5 CSO706 V5 SB 2012_in 5/11/2012 - 5/21/2012 Details
Project 2008-06 CIP-007-5 CSO706 V5 SB 2012_in 5/11/2012 - 5/21/2012 Details
Project 2008-06 CIP-006-5 CSO706 V5 SB 2012_in 5/11/2012 - 5/21/2012 Details
Project 2008-06 CIP-005-5 CSO706 V5 SB 2012_in 5/11/2012 - 5/21/2012 Details
Project 2008-06 CIP-004-5 CSO706 V5 SB 2012_in 5/11/2012 - 5/21/2012 Details
Project 2008-06 CIP-003-5 CSO706 V5 SB 2012_in 5/11/2012 - 5/21/2012 Details
Project 2008-06 CIP-002-5 CSO706 V5 SB 2012_in 5/11/2012 - 5/21/2012 Details
Project 2010-07 PRC-005-1.1a initiai Ballot_in 4/6/2012 - 4/16/2012 Details
Project 2007-09 PRC-019-1 Initial Ballot March 2012_in 4/6/2012 - 4/16/2012 Details
Project 2007-09 MOD-027-1 Initial Ballot March 2012_in 4/6/2012 - 4/16/2012 Details
Project 2007-09 MOD-025-2 Initial Ballot March 2012_in 4/6/2012 - 4/16/2012 Details
Project 2007-09 MOD-026-1 Successive Ballot March 2012_in 3/19/2012 - 3/29/2012 Details
Project 2007-09 PRC-024-1 Successive Ballot March 2012_in 3/19/2012 - 3/29/2012 Details
Project 2007-17 PSMT Successive Ballot March 2012_in 3/19/2012 - 3/28/2012 Details
Project 2010-INT-05 CIP-002-1 R3 for Duke Energy_in 3/14/2012 - 3/23/2012 Details
Project 2011-INT-02 Interpretation of VAR-002 for Constellation_in 3/14/2012 - 3/23/2012 Details
Project 2009-26 Successive Ballot CIP-004-1 WECC_in 3/14/2012 - 3/23/2012 Details
Project 2006-06 IRO-001-3 Jan 2012_in 1/30/2012 - 2/9/2012 Details
Project 2006-06 COM-002-3 Jan 2012_in 1/30/2012 - 2/9/2012 Details
Project 2006-06 Reliability Coordination COM-001-2 Jan 2012_in 1/30/2012 - 2/9/2012 Details
CIP V5 Implementation Project 2008-06 Dec 2011_in 12/16/2011 - 1/6/2012 Details
CIP V5 Definitions Project 2008-06 Dec 2011_in 12/16/2011 - 1/6/2012 Details
Project 2010-07_FAC-001-1 Initial Ballot_rc 12/14/2011 - 12/23/2011 Details
Project 2010-07 FAC-003-3 Initial Ballot_rc 12/14/2011 - 12/23/2011 Details
Project 2010-07 FAC-003-X_rc 12/14/2011 - 12/23/2011 Details
Project 2010-07 PRC-004-2.1 Initial Ballot_rc 12/14/2011 - 12/23/2011 Details
Project 2009-22 Interpretation COM-002-2 R2_rc 12/14/2011 - 12/23/2011 Details
Project 2007-03 Successive Ballot TOP-003-2 Jan 2012_in 1/3/2012 - 1/12/2012 Details
Project 2007-03 Successive Ballot TOP-002-3 Jan 2012_in 1/3/2012 - 1/12/2012 Details
Project 2007-03 RTO Successive Ballot TOP-001-2 Jan 2012_in 1/3/2012 - 1/12/2012 Details
Project_2011_INT-01_MOD-028-1_FPL_initial_rc 12/12/2011 - 12/22/2011 Details
Project 2008-10 Interpretation CIP-006-1 Progress Energy Successive Ballot_rc 12/9/2011 - 12/19/2011 Details
Project 2010-17 BES Definition_Initial Ballot_rc 11/10/2011 - 11/21/2011 Details
Project 2010-17 Technical Information to Support BES Exception_rc 11/10/2011 - 11/21/2011 Details
Project 2008-06 CIP-011-1_CSO706 Version 5 CIP Standards_in 12/16/2011 - 1/6/2012 Details
Project 2008-06 CIP-010-5_CSO706 Version 5 CIP Standards_in 12/16/2011 - 1/6/2012 Details
Project 2008-06 CIP-009-5_CSO706 Version 5 CIP Standards_in 12/16/2011 - 1/6/2012 Details
Project 2008-06 CIP-008-5_CSO706 Version 5 CIP Standards_in 12/16/2011 - 1/6/2012 Details
Project 2008-06 CIP-007-5_CSO706 Version 5 CIP Standards_in 12/16/2011 - 1/6/2012 Details
Project 2008-06 CIP-006-5_CSO706 Version 5 CIP Standards_in 12/16/2011 - 1/6/2012 Details
Project 2008-06 CIP-005-5_CSO706 Version 5 CIP Standards_in 12/16/2011 - 1/6/2012 Details
Project 2008-06 CIP-004-5_CSO706 Version 5 CIP Standards_in 12/16/2011 - 1/6/2012 Details
Project 2008-06 CIP-003-5_CSO706 Version 5 CIP Standards_in 12/16/2011 - 1/6/2012 Details
Project 2008-06 CIP-002-5_CSO706 Version 5 CIP Standards_in 12/16/2011 - 1/6/2012 Details
Project 2008-10 Interpretation CIP-006-1 Progress Energy Successive Ballot_in 11/11/2011 - 11/21/2011 Details
Project 2010-07 PRC-004-2.1 Initial Ballot_in 11/9/2011 - 11/18/2011 Details
Project 2010-07 FAC-003-X_in 11/9/2011 - 11/18/2011 Details
Project 2010-07 FAC-003-3 Initial Ballot_in 11/9/2011 - 11/18/2011 Details
Project 2010-07_FAC-001-1 Initial Ballot_in 11/9/2011 - 11/18/2011 Details
Project 2007-07 Vegetation Management_rc 10/4/2011 - 10/13/2011 Details
Project 2009-22 Interpretation COM-002-2 R2_in 11/8/2011 - 11/18/2011 Details
Project_2011_INT-01_MOD-028-1_FPL_initial_in 11/7/2011 - 11/16/2011 Details
Project 2010-17 Technical Information to Support BES Exception_in 9/30/2011 - 10/10/2011 Details
Project 2007-17 PSMT Initial Ballot September 2011_in 9/19/2011 - 9/29/2011 Details
Project 2009-01 Disturbance and Sabotage Reporting Initial Ballot_in 12/2/2011 - 12/12/2011 Details
Project 2007-12 Frequency Response Initial Ballot_in 11/29/2011 - 12/9/2011 Details
Project 2010-17 BES Definition_Initial Ballot_in 9/30/2011 - 10/10/2011 Details
Project 2006-02 Assess Transmission Future Needs April 2011_rc 7/13/2011 - 7/22/2011 Details
Project 2006-06 Recirculation Ballot IRO-005 July 2011_in 7/15/2011 - 7/25/2011 Details
Project 2006-06 Recirculation Ballot IRO-014 July 2011_in 7/15/2011 - 7/25/2011 Details
Project 2006-06 Recirculation Ballot IRO-002 July 2011_in 7/15/2011 - 7/25/2011 Details
Project 2007-17 PRC-005-2 SB_rc 6/20/2011 - 6/30/2011 Details
Project 2007-09 PRC-024-1 Initial Ballot June 2011_in 7/22/2011 - 8/1/2011 Details
Project 2007-09 MOD-026-1 Initial Ballot_June 2011_in 7/22/2011 - 8/1/2011 Details
Project 2009-06: Facility Ratings_rc 5/12/2011 - 5/23/2011 Details
Project 2007-03 Real-time Operations April 2011_in 5/31/2011 - 6/9/2011 Details
Project 2006-02 Assess Transmission Future Needs April 2011_in 5/18/2011 - 5/31/2011 Details
Project 2010-15: Expedited Revisions to CIP-005-3 SB_in 4/19/2011 - 4/28/2011 Details
Project 2009-06: Facility Ratings_in 4/21/2011 - 5/2/2011 Details
2010-13 Relay Loadability Order Successive Ballot_rc 2/24/2011 - 3/7/2011 Details
Project 2007-07 Vegetation Management_in 2/18/2011 - 2/28/2011 Details
Project 2006-06: Reliability Coordination_in 2/25/2011 - 3/7/2011 Details